Flood in Caribou County, Idaho
Flood June 1, 2023 – June 10, 2023 · Caribou County, Idaho
Where the report was made, with tornadoes recorded within 15 miles over the years.
What the National Weather Service wrote
Extreme snowmelt from heavy snowfall and extreme flows on the Portneuf River caused damage to the Chesterfield Reservoir spillway. The old structure started to deconstruct and makeshift repairs were made to alleviate any significant flooding. Cost to repair the damaged structure were estimated at around 1.5 million dollars.
Began near Chesterfield (42.8700, -112.0182).
Source: NOAA Storm Events Database, event 1115216. Narratives are written by the National Weather Service forecast office that issued the report.
Tornadoes near your address
See every tornado that passed near a place you know, measured to its path.
We couldn’t get your location. Check that location access is allowed for this site, or type an address.